Materials List for a 10,000 Square Foot Concrete Skatepark

4,000 sq feet white visqueen
15 tubes masonry caulk
15 cans spray paint for coping
Diesel fuel for excavation
3 wheelbarrow wheels
25 7.25-inch masonry blades
# Masonry grinding stones for large Milwaukee grinder
25 7.25-inch metal cutting blades
7 7.25-inch skills saw blades for framing
4 rolls 3M duct tape
5 rolls rebar twist ties
5 rolls rebar tie wire
25 pounds 8d duplex nails
25 pounds 16d duplex nails
15 pounds 1.5 inch drywall screws
15 pounds 3 inch drywall screws
1000 20-foot lengths #3 rebar
15 gallons cure and seal (optional)
LOTS of wire for the wire feed welder
unit x 4 x 8 cdx plywood
unit 3/8 x 4 x 8 cdx plywood
unit 2 x 4 x 8 standard or better
20 1 x 6 x 12
20 1 x 6 x 10
20 1 x 4 x 10
5 bundles of 2 x 1 x 2 stakes
5 bundles of 16 x 1 x 2 stakes
15 2 x 2 x 8
25 4 steel stakes
25 3 steel stakes
30 chairs (the gizmos that bolt onto the stakes for the purpose of holding 2 x 4
175 yards of road base gravel
150 yards 4000 psi concrete with pea gravel 3/8 inch
2 x 4 x 8 cedar board for screed
2 x 4 x 10 cedar board for screed
2 x 4 x 12 cedar board for screed
10 pieces 2 OD schedule 40 steel pipe 20-foot lengths bent at 7 radius
10 pieces 2 OD schedule 40 steel pipes 20-foot length straight.
Burlap fabric 4,000

Equipment List

Backhoe with Loader
Bobcat
Compactor
Rebar cutter
Power trowel
Pipe bender
Small grinders
Large Milwaukee grinder
Wire feed welder
Concrete trowels, tools, rakes, shovels